HAILSHAM ACTIVE CIRCUIT, WESTERN ROAD RECREATION GROUND ELECTRICAL SERVICES

A Tender Notice
by HAILSHAM TOWN COUNCIL - MAIN NUMBER

Source
Contracts Finder
Type
Contract (Works)
Duration
3 month
Value
£38K-£48K
Sector
INDUSTRIAL
Published
18 May 2022
Delivery
19 Sep 2022 to 12 Dec 2022
Deadline
24 Jun 2022 17:00

Related Terms

Location

Geochart for 1 buyers and 0 suppliers

Description

Contact Details - John Harrison John.harrison@hailsham-tc.gov.uk 01323 841702 Hailsham Town Council Inglenook, Market Street, Hailsham East Sussex BN27 2AE Description or works: The works consist of the illumination of the Hailsham Active Circuit within the Western Road Recreation grounds. The electrical works consist of: - • Provision of a new UKPN electrical supply • Associated ground works for the UKPN installation • Provision of new distribution arrangement in kiosk • Provision of frost protection heater to kiosk • Provision of new illumination to Active circuit • Provision of lighting control • Associated ground works to column erection • Testing and commissioning • Provision of record documentation This specification has been written at a design stage before the completion of the active circuit installation works and makes the assumption that the kiosk in preparation for the UKPN supply has been erected and furnished with the 3 no outgoing ducts and the required twin wall ducting installation to the entire perimeter of the active circuit as per informed requirement. The Lamp columns cannot exceed 4m height to ensure the installation can be made under permitted development rights. • Commence of the project is subject to additional funding for the project. • The funding bid outcome will be known by 6th September 2022 and therefore quotes are required to be valid to the end of September 2022 Tenders to be sent via email to: john.harrison@hailsham-tc.gov.uk Or via post to: John Harrison, Town Clerk, Hailsham Town Council, Inglenook, Market Street, Hailsham, East Sussex, BN27 2AE

CPV Codes

  • 31000000 - Electrical machinery, apparatus, equipment and consumables; lighting

Indicators

  • Contract is suitable for SMEs.

Other Information

The successful contractor shall be responsible to ensure that the development of the design from stage 4 information provided and for the design, supply, delivery, installation of plant and materials are included within the tender package. Testing, commissioning, setting to work and all handover documents should also be provided as part of the works. It is the successful contractor's responsibility to ensure that the installation is installed in line with the drawings provided and in accordance with all current regulatory requirements and industry standards including but not limited to all CIBSE/IET guidance. The successful contractor shall carry out the final design and co-ordination of the electrical services as described and to produce fully co-ordinated working drawings. these shall be issued for comment and approval before works are to commence, any works on site before approval shall be at the risk of the successful contractor. Any change to the stage 4 design provided including modifications and relocation of services shall become the responsibility of the successful contractor including warranties for the altered services. Please note that all architectural and structural drawings should be examined to ensure the tenderer fully understands the specific nature of the installation. If these are not included within the tender package, these are to be requested from the poster of the tender information. A site visit must be performed to ensure the site constraints are realised and that the contractor is fully familiar with the site. The works shall comprise of the complete installation as noted on the drawings and specification this shall provide fully working, tested and commissioned systems as required. This includes providing specified performance and environmental conditions, all ancillary items, and sundry items for the installation to operate efficiently and provision for maintenance to be carried out in a safe and practical manner. The works should also be completed in line with all relevant regulations, recommendations, British Standards, Code of Practice and industry recognised methods of installation and workmanship. 1768 - E - 1000.pdf Tender Return Schedule 1768 - E - 1001.pdf Document Register 1768-E-0000 Document Issue Hailsham Cycleway.pdf Distribution Schematic 1768 - E - 0001.pdf Lighting Layout (1 of 4) 1768 - E - 0200.pdf Lighting Layout 2 of 4 1768 - E - 0201.pdf Lighting Layout 3 of 4 1768 - E - 0202.pdf Lighting Layout 4 of 4 1768 - E - 0203.pdf Circuit Schedule 1768-E-0700.pdf Luminaire Schedule 1768-E-0701.pdf Electrical Kiosk Layout 1768 - E - 0900.pdf Lamp Column Details 1768 - E - 0901.pdf Power Networks Detail Connection 1768 - E - 2000.pdf Technical Drawing 2mod charles.pdf Technical Drawing AXIA_3_ProductSheet_EN (1).pdf Technical Drawing OP167833LD16974 Western Road Rec Ground Hailsham Report.pdf Technical Drawing Pharos.pdf Technical Drawing Untitled 82.pdf Technical Drawing Untitled 83.pdf

Reference

  • Western Rd Rec Lights (2nd)
  • CF 399ec046-590a-4bac-85f2-ed5715d47a3e

Domains