A63 Brough Junction Improvements

A Tender Notice
by EAST RIDING OF YORKSHIRE COUNCIL

Source
Find a Tender
Type
Contract (Works)
Duration
10 month
Value
£3M
Sector
CONSTRUCTION
Published
19 Dec 2022
Delivery
To 11 Dec 2023 (est.)
Deadline
14 Feb 2023 12:00

Related Terms

Location

Yorkshire and the Humber: Welton Road, Brough, East Riding of Yorkshire

Geochart for 1 buyers and 0 suppliers

Description

The proposed scheme replaces the existing 4 way traffic signal at the junction of the Welton Road/Water Lane(A63 slip road link)/Welton Low Road with a 3 way signalised roundabout, with Welton Low Road becoming a priority junction. It includes pedestrian and cycle improvements largely to improve the route to South Hunsley School to and from Brough. The existing junction is elevated and the new roundabout is elevated on an embankment to match the existing levels. The existing junction creates congestion at peak hours with large queues forming mostly from commuter traffic to Hull in the am peak and from Hull in the pm peak, the proposals are expected to reduce this queuing.

Award Criteria

Tender Programme 10%
Method Statement 8%
CVs 2%
price 80%

CPV Codes

  • 45200000 - Works for complete or part construction and civil engineering work

Indicators

  • This is a one-off contract (no recurrence)
  • Renewals are not available.
  • Professional qualifications are sought.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

  • ocds-h6vhtk-039265
  • FTS 035833-2022

Domains