158/9 Engine & Gearbox Delivery
A Contract Award Notice
by NORTHERN TRAINS LIMITED
- Source
- Find a Tender
- Type
- Contract (Goods)
- Duration
- not specified
- Value
- ___
- Sector
- TRANSPORT
- Published
- 11 Jul 2023
- Delivery
- not specified
- Deadline
- n/a
Related Terms
Location
United Kingdom:
1 buyer
- Northern Trains York
1 supplier
- Unnamed None
Description
Supply of class 158/9 Engine & Gearboxes.
Total Quantity or Scope
NTL lease 10 2-car Eversholt Class 158/9 units on a dry lease. NTL are responsible for procuring new engines and gearboxes as required through the lease. The supplier of overhauled powertrain components is LH (A division of Wabtec UK). Eversholt do not hold a float of powertrain components for their own fleet, and so Porterbrook allow NTL to utilise their float to support powertrain changeouts.
Award Detail
| 1 | Unnamed (None)
|
Renewal Options
2 year optional extension
CPV Codes
- 34600000 - Railway and tramway locomotives and rolling stock and associated parts
Indicators
- Options are available.
Legal Justification
LH are the only supplier for the powertrain components in question. (Porterbrook) have a SMA with LH precluding any third party from undertaking the overhauls. LH are the supplier with a SMA for this work and have been the provider of these spares since the 158/9s came into operation. We therefore do not have alternative options which we could utilise.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-03e08d
- FTS 019748-2023