MCF Crossings (Phase 3), Rochdale
A Contract Award Notice
by TRANSPORT FOR GREATER MANCHESTER
- Source
- Contracts Finder
- Type
- Framework (Works)
- Duration
- 1 month
- Value
- £541K
- Sector
- CONSTRUCTION
- Published
- 12 Jul 2023
- Delivery
- 26 Aug 2023 to 24 Sep 2023
- Deadline
- 16 Jun 2023 11:00
Related Terms
Location
1 buyer
- Transport for Greater Manchester Manchester
1 supplier
- Rosgal Manchester
Description
Tender documents issued to those awarded on TfGM Highways framework. There are multiple schools within the vicinity of these works, most notably Bowlee Park Community School on Windermere Road, which has circa 900 pupils. Consequently, there's a requirement for as much construction work as possible to be completed during the summer school holidays (24th July to 5th September 2023). An existing signal-controlled crossing on Wood Street is to be upgraded as part of the works. When this is decommissioned, it will be necessary provide a temporary controlled crossing facility close by until the new facility is operational. The anticipated legal notice period for the crossings on Wood Street and Windermere Road is May/June 2022 for 28 days. TRO notices for the proposed cycle track and new waiting restrictions are being progressed within the same timeframe. The contractor shall liaise with Rochdale Streetworks teams to identify the most appropriate times to carry out the works, noting the requirement to undertake the most disruptive elements during the 2023 school summer holidays.
Award Detail
| 1 | Rosgal (Manchester)
|
CPV Codes
- 45000000 - Construction work
Indicators
- Contract is suitable for SMEs.
- Contract is suitable for VCOs.
Reference
- GMPTE001-DN671045-95274840
- CF 330aaa93-b30f-4ba2-8dbb-7210e28038a4