Supply chain notice: Organic Rankine Cycle (ORC) System
A Pipeline Notice
by MINISTRY OF DEFENCE
- Source
- Contracts Finder
- Type
- Potential Contract ()
- Duration
- 1 year
- Value
- £4M
- Sector
- CONSTRUCTION
- Published
- 21 Jan 2025
- Delivery
- 01 Sep 2025 to 31 Aug 2026
- Deadline
- 01 Jan 1 00:00
Related Terms
Location
Geochart for 1 buyers and 0 suppliers
1 buyer
- MOD Portsmouth
Description
1. General Description Organic Rankine Cycle (ORC) system designed to generate electricity from low-temperature waste heat sources. It should be capable of operating continuously or intermittently with a CHP engine. 2. Technical Specifications Net Power Output: 200 - 400 kW per unit Thermal Power Absorbed: 1000 - 4500 kW Hot Water Temperature: Minimum 80°C Working Media: Environmentally friendly, non-toxic, non-flammable Control System: PLC system / MODBUS TCP
CPV Codes
- 45251100 - Construction work for power plant
Reference
- tender_480098/1444140
- CF cd69968c-922b-4ef9-ac5d-2f01485337e6