Building and Civil Engineering Works Framework
A Contract Award Notice
by TRENITALIA C2C LIMITED
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- not specified
- Value
- £4M-£95M
- Sector
- CONSTRUCTION
- Published
- 14 Mar 2025
- Delivery
- not specified
- Deadline
- n/a
Related Terms
Location
South East England:
1 buyer
- Trenitalia C2C London
12 suppliers
- CK Rail Solutions Chesterfield
- Amalgamated Construction Barnsley
- Dyer & Butler Hertfordshire
- Construction Marine Leeds
- Enable Infrastructure London
- Ha Marks London
- Consortia Integrated Services Liverpool
- Railscape Rayleigh
- RTG Rail Services Basildon
- Aureos Rail London
- Total Property Support Services Hoddesdon
- Nationwide Rail Salisbury
Description
c2c have procured a multi-lot, multi-contractor Framework Contract over a 4-year term with optional extension periods of two individual 2-year periods to support the delivery of associated Building and Civil Engineering works. c2c used a Restricted Procedure in accordance with the Utilities Contract Regulations 2016 to procure the Framework Contract, which consists of the following Lots: 1: Multi-Disciplinary Building and Civils Works 2: Station Building and Roofing Works 3: Internal Station Improvement Works 4: Bridges 5: Ancillary Civils 6: Canopies 7: Platforms Five contractors were successfully appointed to each Lot.
Lot Division
| 1 | Multi-Disciplinary Building and Civil Engineering Works This Lot covers the delivery of Multi-Disciplinary Building and Civil Engineering Works and/or any works which spans multiple lots across the Framework Contract. |
| 2 | Station Building and Roofing Works This Lot covers the delivery of Station Building and Roofing Works, which may include, but not be limited to, any structural works, maintenance and/or improvements required to the station superstructure and roof. |
| 3 | Internal Station Improvement Works This Lot covers the delivery of internal station improvement works, which may include, but not be limited to, any structural works such as Windows, Doors and Internal Walls, maintenance and/or improvements required inside the station. |
| 4 | Bridges This Lot covers the delivery of bridges Works, which may include, but not be limited to, any structural works for Metallic, Masonry and concreate structures, maintenance and/or improvements required to the identified bridges. |
| 5 | Ancillary Civils This Lot covers ancillary works including but not limited drainage, groundworks and landscaping. |
| 6 | Canopies This Lot covers the delivery of Canopies, which may include, but not be limited to, any roped access, Pigeon control and/or improvements required to the canopies. |
| 7 | Platforms This Lot covers the delivery of Platform Works, which may include, but not be limited to, any structural works to platform walls, maintenance and/or improvements required to the station platforms. |
Award Detail
| 1 | CK Rail Solutions (Chesterfield)
|
| 2 | Amalgamated Construction (Barnsley)
|
| 3 | Dyer & Butler (Hertfordshire)
|
| 4 | Construction Marine (Leeds)
|
| 5 | Enable Infrastructure (London)
|
| 6 | Ha Marks (London)
|
| 7 | Dyer & Butler (Hertfordshire)
|
| 8 | Consortia Integrated Services (Liverpool)
|
| 9 | Construction Marine (Leeds)
|
| 10 | Railscape (Rayleigh)
|
| 11 | Dyer & Butler (Hertfordshire)
|
| 12 | Ha Marks (London)
|
| 13 | Construction Marine (Leeds)
|
| 14 | Consortia Integrated Services (Liverpool)
|
| 15 | RTG Rail Services (Basildon)
|
| 16 | Amalgamated Construction (Barnsley)
|
| 17 | CK Rail Solutions (Chesterfield)
|
| 18 | Dyer & Butler (Hertfordshire)
|
| 19 | Construction Marine (Leeds)
|
| 20 | Aureos Rail (London)
|
| 21 | CK Rail Solutions (Chesterfield)
|
| 22 | Amalgamated Construction (Barnsley)
|
| 23 | Dyer & Butler (Hertfordshire)
|
| 24 | Aureos Rail (London)
|
| 25 | Enable Infrastructure (London)
|
| 26 | Amalgamated Construction (Barnsley)
|
| 27 | Dyer & Butler (Hertfordshire)
|
| 28 | Construction Marine (Leeds)
|
| 29 | Total Property Support Services (Hoddesdon)
|
| 30 | Nationwide Rail (Salisbury)
|
| 31 | CK Rail Solutions (Chesterfield)
|
| 32 | Dyer & Butler (Hertfordshire)
|
| 33 | Amalgamated Construction (Barnsley)
|
| 34 | Construction Marine (Leeds)
|
| 35 | Aureos Rail (London)
|
CPV Codes
- 45000000 - Construction work
- 44000000 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 71000000 - Architectural, construction, engineering and inspection services
- 45261420 - Waterproofing work
- 45262100 - Scaffolding work
- 45421100 - Installation of doors and windows and related components
- 45221100 - Construction work for bridges
- 45112700 - Landscaping work
- 45213312 - Car park building construction work
- 45232450 - Drainage construction works
- 45232451 - Drainage and surface works
- 45233161 - Footpath construction work
- 45262210 - Foundation work
- 44115710 - Canopies
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-0450d1
- FTS 009466-2025