Framework Agreement for M&E Resource Support
A Contract Award Notice
by WESSEX WATER SERVICES LTD
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- not specified
- Value
- ___
- Sector
- CONSTRUCTION
- Published
- 12 May 2025
- Delivery
- not specified
- Deadline
- n/a
Related Terms
Location
South West England:
1 buyer
35 suppliers
- DMS Engineering Chippenham
- Dowling & Cosh Wells
- Edron Engineering Frome
- Elg Civil & Mechanical Engeneering Bristol
- Ga UK Group Southampton
- Gel Engineering Enfield
- Going Group Shaftesbury
- Hanevo Alton
- K Gregory Construction Frome
- Mem Site Services Bristol
- Mills Engineering Services Radstock
- Msel Services Eastleigh
- Network Plus Services Manchester
- Nightjar Engineering & Construction Petersfield
- SDR Metal Fabrications Bristol
- Sherborne Utilities Sherborne
- Silon Engineering & Construction Reading
- Tork Radstock
- Ukse Group Alton
- Accm Southwest Radstock
- Amd Electrical Bridgwater
- BW Controls Wellington
- Ciw Electrical Services Bristol
- C&N Electrical Services Portland
- Forest Electrical Services Ilminster
- Geemec Bridgwater
- JJ Electrical Weymouth
- Mildren Construction Christchurch
- Pearce & Wyatt Services Bristol
- Phil Bridges & Son Electrical Wells
- Pro Electro Weston Super Mare
- San Electrical Newport
- Electrical & Mechanical Solutions Bristol
- Bartlett Contractors Salisbury
- R Howard Utilities Sherborne
Description
The Framework Agreement is for suppliers to provide Mechanical and Electrical (M&E) Resource Support for the delivery of the Wessex water AMP8 capital investment programme. This Framework is divided into 4 Lots as below, each of which is further divided into 3 sublots corresponding to the North, South and West sub-areas of the Wessex Water Services Operational Region. These Lots relate to the provision of 'labour only' support on site: 1. Mechanical Support 2. Electrical Support 3. M&E Staff 4. Mechanical & Incidental Civils Support
Lot Division
| 1 | The scope of the Agreement is for the provision of skilled Mechanical and/or Electrical resource to undertake mechanical and electrical activities associated with Wessex Water’s construction sites and operational sites/assets. This includes schemes for new works, refurbishment. works, replacement works or maintenance works. The projects will cover a wide range of potable and waste-water infrastructure improvement to offices, treatment works and other operational sites throughout the Wessex Water region. As such, the works include both planned programmes of work and reactive works and the individuals will work either: alongside Company personnel following the direction of the Site Manager; or, with a team leader as part of a gang; or, under the direction of a Wessex Water Site Manager. This Lot 1 is for the provision of skilled Mechanical resource to undertake various mechanical activities associated with Wessex Water’s construction sites and operational sites/assets. Mechanical requirements include (but are not limited to): a) Installing metal and plastic/ABS pipework b) Mechanically installing pumping stations, actuated valves, skid mounted equipment, screens, wash water booster sets and filters |
| 2 | The scope of the Agreement is for the provision of skilled Mechanical and/or Electrical resource to undertake mechanical and electrical activities associated with Wessex Water’s construction sites and operational sites/assets. This includes schemes for new works, refurbishment. works, replacement works or maintenance works. The projects will cover a wide range of potable and waste-water infrastructure improvement to offices, treatment works and other operational sites throughout the Wessex Water region. As such, the works include both planned programmes of work and reactive works and the individuals will work either: alongside Company personnel following the direction of the Site Manager; or, with a team leader as part of a gang; or, under the direction of a Wessex Water Site Manager. This Lot 2 is for the provision of skilled Electrical resource to undertake various electrical activities associated with Wessex Water’s construction sites and operational sites/assets. Electrical requirements include (but are not limited to): a) Testing and Inspection of electrical circuits b) Glanding of SWA cables c) Terminating cabling |
| 3 | The scope of the Agreement is for the provision of skilled Mechanical and/or Electrical resource to undertake mechanical and electrical activities associated with Wessex Water’s construction sites and operational sites/assets. This includes schemes for new works, refurbishment. works, replacement works or maintenance works. The projects will cover a wide range of potable and waste-water infrastructure improvement to offices, treatment works and other operational sites throughout the Wessex Water region. As such, the works include both planned programmes of work and reactive works and the individuals will work either: alongside Company personnel following the direction of the Site Manager; or, with a team leader as part of a gang; or, under the direction of a Wessex Water Site Manager. This Lot 3 is for the provision of skilled Mechanical and Electrical resource to undertake various M&E activities associated with Wessex Water’s construction sites and operational sites/assets. Requirements include (but are not limited to): a) Leading projects b) Managing projects |
| 4 | The scope of the Agreement is for the provision of skilled Mechanical and/or Electrical resource to undertake mechanical and electrical activities associated with Wessex Water’s construction sites and operational sites/assets. This includes schemes for new works, refurbishment. works, replacement works or maintenance works. The projects will cover a wide range of potable and waste-water infrastructure improvement to offices, treatment works and other operational sites throughout the Wessex Water region. As such, the works include both planned programmes of work and reactive works and the individuals will work either: alongside Company personnel following the direction of the Site Manager; or, with a team leader as part of a gang; or, under the direction of a Wessex Water Site Manager. This Lot 4 is for the provision of skilled Mechanical and Civils resource to undertake various Mechanical activities which require an element of civils tasks to also be completed, associated with Wessex Water’s construction sites and operational sites/assets. This includes all scope identified in Lot 1 Mechanical Support and any Civils work will only be carried out in conjunction with associated mechanical works taking place. Requirements include (but are not limited to): a) Concrete Plinths b) Paths, bollards and Kerb lines c) Small concrete bases for package plant d) Draw Pits and Ductwork e) Installation of buried pipework f) Minor modifications to existing structures g) Installation of a new pump inclusive of pump plinth and installation of tanks h) Site Investigation Works / Trial Pits i) Installation of temporary works |
Award Detail
| 1 | DMS Engineering (Chippenham)
|
| 2 | Dowling & Cosh (Wells)
|
| 3 | Edron Engineering (Frome)
|
| 4 | Elg Civil & Mechanical Engeneering (Bristol)
|
| 5 | Ga UK Group (Southampton)
|
| 6 | Gel Engineering (Enfield)
|
| 7 | Going Group (Shaftesbury)
|
| 8 | Hanevo (Alton)
|
| 9 | K Gregory Construction (Frome)
|
| 10 | Mem Site Services (Bristol)
|
| 11 | Mills Engineering Services (Radstock)
|
| 12 | Msel Services (Eastleigh)
|
| 13 | Network Plus Services (Manchester)
|
| 14 | Nightjar Engineering & Construction (Petersfield)
|
| 15 | SDR Metal Fabrications (Bristol)
|
| 16 | Sherborne Utilities (Sherborne)
|
| 17 | Silon Engineering & Construction (Reading)
|
| 18 | Tork (Radstock)
|
| 19 | Ukse Group (Alton)
|
| 20 | Accm Southwest (Radstock)
|
| 21 | Amd Electrical (Bridgwater)
|
| 22 | BW Controls (Wellington)
|
| 23 | Ciw Electrical Services (Bristol)
|
| 24 | C&N Electrical Services (Portland)
|
| 25 | DMS Engineering (Chippenham)
|
| 26 | Edron Engineering (Frome)
|
| 27 | Forest Electrical Services (Ilminster)
|
| 28 | Ga UK Group (Southampton)
|
| 29 | Geemec (Bridgwater)
|
| 30 | Gel Engineering (Enfield)
|
| 31 | Hanevo (Alton)
|
| 32 | JJ Electrical (Weymouth)
|
| 33 | K Gregory Construction (Frome)
|
| 34 | Mem Site Services (Bristol)
|
| 35 | Mildren Construction (Christchurch)
|
| 36 | Msel Services (Eastleigh)
|
| 37 | Network Plus Services (Manchester)
|
| 38 | Pearce & Wyatt Services (Bristol)
|
| 39 | Phil Bridges & Son Electrical (Wells)
|
| 40 | Pro Electro (Weston Super Mare)
|
| 41 | San Electrical (Newport)
|
| 42 | Silon Engineering & Construction (Reading)
|
| 43 | Ukse Group (Alton)
|
| 44 | Ciw Electrical Services (Bristol)
|
| 45 | DMS Engineering (Chippenham)
|
| 46 | Dowling & Cosh (Wells)
|
| 47 | Electrical & Mechanical Solutions (Bristol)
|
| 48 | Ga UK Group (Southampton)
|
| 49 | Geemec (Bridgwater)
|
| 50 | Gel Engineering (Enfield)
|
| 51 | Going Group (Shaftesbury)
|
| 52 | Hanevo (Alton)
|
| 53 | K Gregory Construction (Frome)
|
| 54 | Mem Site Services (Bristol)
|
| 55 | Mills Engineering Services (Radstock)
|
| 56 | Msel Services (Eastleigh)
|
| 57 | Network Plus Services (Manchester)
|
| 58 | Phil Bridges & Son Electrical (Wells)
|
| 59 | Pro Electro (Weston Super Mare)
|
| 60 | Silon Engineering & Construction (Reading)
|
| 61 | Tork (Radstock)
|
| 62 | Bartlett Contractors (Salisbury)
|
| 63 | Dowling & Cosh (Wells)
|
| 64 | Elg Civil & Mechanical Engeneering (Bristol)
|
| 65 | Going Group (Shaftesbury)
|
| 66 | Hanevo (Alton)
|
| 67 | K Gregory Construction (Frome)
|
| 68 | Mem Site Services (Bristol)
|
| 69 | Mills Engineering Services (Radstock)
|
| 70 | Network Plus Services (Manchester)
|
| 71 | Nightjar Engineering & Construction (Petersfield)
|
| 72 | R Howard Utilities (Sherborne)
|
| 73 | Silon Engineering & Construction (Reading)
|
Renewal Options
Framework may be extended by a further 3 years following the initial 5 year period
CPV Codes
- 45000000 - Construction work
Indicators
- Options are available.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-028ecc
- FTS 020565-2025