SBC - Refurbishment and Reconfiguration of existing buildings. including associated Fencing, Gates, Landscaping and Parking

A Tender Notice
by SLOUGH BOROUGH COUNCIL

Source
Find a Tender
Type
Contract (Works)
Duration
4.5 month
Value
£600K
Sector
CONSTRUCTION
Published
14 May 2025
Delivery
21 Jul 2025 to 30 Nov 2025
Deadline
12 Jun 2025 13:00

Related Terms

Location

Geochart for 1 buyers and 0 suppliers

Description

Our Lady of Peace is a two–form entry Primary School with Nursery provision. The school is a Catholic Voluntary Aided school within the Diocese of Northampton and has close links with the Parish of Our Lady of Peace Church in Burnham. SBC is looking to split the primary school site into two, creating two school sites instead of one. There are currently 2 main school blocks on the site (as well as various other smaller buildings). The main southern block, smaller buildings and playing fields will house the school currently using the whole site. Therefore, OLOP will go from occupying both main blocks to using only one to the south. The vacated block, to the north will be converted for use by a special educational needs school as a satellite provision. The high level brief of works to be carried out have been agreed with the schools and are set out in this document. The works will be split into phases, those that are required to get the two schools open and operational for 28th August 2025 (Our Lady of Peace) and 30th November 2025 (Arbour Vale Satellite school).

CPV Codes

  • 45000000 - Construction work

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

  • ocds-h6vhtk-051362
  • FTS 021368-2025

Domains