CWF Lot 2A C229 Pow Wath Bridge U2057 - Structure Replacement
A Contract Award Notice
by CUMBERLAND COUNCIL
- Source
- Contracts Finder
- Type
- Contract (Works)
- Duration
- 5 month
- Value
- £145K
- Sector
- CONSTRUCTION
- Published
- 16 May 2025
- Delivery
- 27 May 2025 to 31 Oct 2025
- Deadline
- 03 May 2025 11:00
Related Terms
Location
1 buyer
- Cumberland Council Carlisle
1 supplier
- Metcalfe Plant Hire Cumbria
Description
Pow Wath Bridge is a single-span R.C. slab structure which carries the U2057 over Pow Beck in Orton, Carlisle. This bridge has a span length of 3.96m. The height of the soffit is 1.17m. O.S. grid Co-ordinates 331731E; 551973N. A General Bridge Inspection (GBI) in September 2022 identified significant spall to the concrete deck exposing corroded re-bar over large areas underneath the bridge. In addition to the spall, there are many other areas of delamination throughout with sections that could easily be knocked off. In November 2023 and February 2024, Concrete testing and assessment were undertaken at Pow Wath Bridge. Following this, a temporary 7.5 Tonnes Maximum Gross Weight Restriction was implemented until repairs are carried out. Cumberland Council are progressing a scheme to replace the existing bridge with a precast reinforced concrete structure and masonry parapets. This project is to be let as a construction contract with Contractor designed elements.
Award Detail
| 1 | Metcalfe Plant Hire (Cumbria)
|
CPV Codes
- 45000000 - Construction work
Reference
- CC001-DN766740-58068864
- CF 544ea794-dfcc-4a34-b9f0-4c98e6063a3b