Materiel Distribution Land (MDL) Heavy Equipment Transporter (HET) PME RFI

A Tender Notice
by DEFENCE EQUIPMENT AND SUPPORT

Source
Find a Tender
Type
Contract (Goods)
Duration
12 year
Value
£0-£315M
Sector
TRANSPORT
Published
30 Jun 2025
Delivery
01 Jul 2027 to 01 Jul 2039
Deadline
n/a

Related Terms

Location

Geochart for 1 buyers and 0 suppliers

Description

The Ministry of Defence (the Authority) under the Materiel Distribution Land (MDL) programme is developing a requirement project for Heavy Equipment Transporter (HET) platform. Initially circa 70 to 90 vehicles with an integrated support solution service for an initial period of ten years, with potential options to increase the acquisition volume and extend beyond the initial support period. Aspirational Full Operating Capability (FOC) is June 2029. This requirement aims to introduce a new, technologically advanced system for the delivery of heavy and out-of-gauge equipment, with a minimum threshold of eighty-five (85) metric tonnes, featuring improved low mobility lift capabilities. This system will significantly improve and sustain the operational movement of heavy, mission-critical equipment well into the future. The primary role is to transport heavy armoured equipment, including armoured fighting vehicles (AFVs) and main battle tank (MBT), but it must also be capable of moving lighter equipment into the theatre of operations. Additionally, this equipment will be used during peacetime for training delivery both in the UK and overseas. A PIN has previously been released for this requirement reference 2025/S 000-002913.

CPV Codes

  • 34000000 - Transport equipment and auxiliary products to transportation

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. ** This Notice has been amended to clarify that any requests received after the dates within the notice will be sent a copy of the questionnaire for information purposes only.

Reference

  • ocds-h6vhtk-04fd69
  • FTS 036032-2025

Domains