Oban Pier Upgrades
A Prior Information Notice
by NORTHERN LIGHTHOUSE BOARD
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 5.5 month
- Value
- £0-£250K
- Sector
- CONSTRUCTION
- Published
- 07 Aug 2025
- Delivery
- 15 Oct 2025 to 01 Apr 2026
- Deadline
- n/a
Related Terms
Location
Highlands and Islands:
1 buyer
- Northern Lighthouse Board Edinburgh
Description
Northern Lighthouse Board (NLB) is looking for a contractor to complete upgrades to the timber beams at the pier at our NLB depot in Oban, PA34 4LS. The central section of the pier consists of a T-shape extension to the original pier added in the 1950’s. This provided a front edge of approximately 49m and allowed for berthing in deeper water. This was then extended in the early 2000’s to provide NLB with a larger operational surface area, extending the central section by approximately 10m and creating new eastern and western sections to the pier. All seaward faces have timber fender piles, though only the central section is currently used for berthing The scope of works required are as follows: •Replace 3 No. full pile with like-for-like 360x360mm greenheart pile, replacing brackets, bolts, nuts and spacers as required. •Replace 3 No. fender with heavy-duty rubber D-fender, replacing fixings as required. •Replace 6m of stair support waling with like-for-like 360x360mm greenheart waling beam, replacing brackets, nuts and bolts as required. •Replace total 40m of lower waling with like-for-like 360x360mm greenheart waling beam, replacing splice plates, brackets, nuts and bolts as required. •Replace 8m of cope beam with like-for-like greenheart members (210x210mm and 260x150mm), replacing fixings as required. •Replace 24m of cope beam with like-for-like greenheart members (300x150mm), replacing fixings as required. We require the contractor to carry out the scope of works below: •Attend a mandatory site visit to Oban in September 2025 to fully understand the project scope of works and location. •Provide a detailed tender submission of how they will carry out these upgrades •Full installation of the repairs and upgrades by the end March 2025. We are looking for contractors to provide their interest for this project at this time, full details of the project scope and tender requirements, along with supporting documentation of a bill of quantities and drawings shall be in the invitation to tender documentation. Timeline Set out below is the proposed procurement timetable for this project. This is intended to be a guide and whilst NLB does not intend to depart from the timetable, it reserves the right to do so at any time. Issue of Invitation to Tender – 19th August 2025 Mandatory site visit at Oban depot – proposed Monday 8th September 2025 Clarification deadline for suppliers – 16th September 2025 Tender return deadline – 26th September 2025 Tender Award – by 15th October 2025 Site mobilisation – 24th November 2025 Completion of project – By end March 2025
CPV Codes
- 03419100 - Timber products
- 34516000 - Marine fenders
- 45241300 - Pier construction work
- 45244000 - Marine construction works
Other Information
For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Timber-products./CWVQ26... To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/CWVQ26YBB2 ** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-05839f
- FTS 047021-2025