Structural Steelwork to new Link Bridge, Canopy and Lift Shaft Enclosure

A Tender Notice
by MACE DRAGADOS

Source
Contracts Finder
Type
Contract (Works)
Duration
6.5 month
Value
£1M-£2M
Sector
CONSTRUCTION
Published
20 Aug 2025
Delivery
08 Dec 2025 to 30 Jun 2026
Deadline
26 Aug 2025 11:00

Related Terms

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Mace Dragados require a steelwork subcontractor to carry out the design (to Stage 5) supply, fabrication, installation and erection of the following 1. A 13200mm long 2100mm wide link bridge connecting the Maria Fidelis Old School Building and the Maria Fidelis Building Accommodation first floors. Includes steel structure, concrete foundations and cladding. 2. Steel frame structure, concrete foundations and external cladding for a 8 person lift shaft on the Maria Old School Building providing access to ground level, bridge level, first floor, second floor and roof. Lift to be installed by Others. 3. A 10m x 4m steel canopy at the entrance of the Maria Fidelis Old School Building. See attached drawings

CPV Codes

  • 45223210 - Structural steelworks

Indicators

  • Contract is suitable for SMEs.

Other Information

Please follow this link to view the notice https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=98391...

Reference

  • C4N98391179
  • CF 883d2c15-2c39-43d1-a129-f452ef686b0b

Domains