Oban Pier Upgrades

A Tender Notice
by NORTHERN LIGHTHOUSE BOARD

Source
Find a Tender
Type
Contract (Works)
Duration
5.5 month
Value
£250K
Sector
CONSTRUCTION
Published
29 Aug 2025
Delivery
15 Oct 2025 to 01 Apr 2026
Deadline
25 Sep 2025 13:00

Related Terms

Location

Highlands and Islands:

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Northern Lighthouse Board (NLB) is looking for a contractor to complete upgrades to the timber beams at the pier at our NLB depot in Oban, PA34 4LS. The central section of the pier consists of a T-shape extension to the original pier added in the 1950’s. This provided a front edge of approximately 49m and allowed for berthing in deeper water. This was then extended in the early 2000’s to provide NLB with a larger operational surface area, extending the central section by approximately 10m and creating new eastern and western sections to the pier. All seaward faces have timber fender piles, though only the central section is currently used for berthing The scope of works required are as follows: •Replace 3 No. full pile with like-for-like 360x360mm greenheart pile, replacing brackets, bolts, nuts and spacers as required. •Replace 3 No. fender with heavy-duty rubber D-fender, replacing fixings as required. •Replace 6m of stair support waling with like-for-like 360x360mm greenheart waling beam, replacing brackets, nuts and bolts as required. •Replace total 40m of lower waling with like-for-like 360x360mm greenheart waling beam, replacing splice plates, brackets, nuts and bolts as required. •Replace 8m of cope beam with like-for-like greenheart members (210x210mm and 260x150mm), replacing fixings as required. •Replace 24m of cope beam with like-for-like greenheart members (300x150mm), replacing fixings as required. Potential replacement of galvanised steel ladders and access steps on a like for like basis will also be considered. We require the contractor to carry out the scope of works below: •Attend a mandatory site visit to Oban in September 2025 to fully understand the project scope of works and location. •Provide a detailed tender submission of how they will carry out these upgrades •Full installation of the repairs and upgrades by the end March 2025. Timeline Set out below is the proposed procurement timetable for this project. This is intended to be a guide and whilst NLB does not intend to depart from the timetable, it reserves the right to do so at any time. Issue of Invitation to Tender – 28th August 2025 Mandatory site visit at Oban depot – proposed Monday 8th September 2025 Clarification deadline for suppliers – 16th September 2025 Tender return deadline – 25th September 2025 Tender Award – by 15th October 2025 Site mobilisation – 24th November 2025 Completion of project – By end March 2025

Award Criteria

Bill of Quantities completion and Daywork/Standing rates _
Technical and Capability completion _

CPV Codes

  • 03419100 - Timber products
  • 34516000 - Marine fenders
  • 45241300 - Pier construction work
  • 45244000 - Marine construction works

Other Information

To view this notice, please click here: https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=976586808 ** PREVIEW NOTICE, please check Find a Tender for full details. **