Provision of Fire Risk Assessment for Network Rail, Transport for Wales and Great Western Railway
A Tender Notice
by NETWORK RAIL INFRASTRUCTURE LIMITED
- Source
- Find a Tender
- Type
- Framework (Services)
- Duration
- 3 year
- Value
- £22M-£3M
- Sector
- DEFENCE
- Published
- 14 Nov 2025
- Delivery
- 01 Apr 2026 to 31 Mar 2029
- Deadline
- n/a
Related Terms
Location
United Kingdom:
1 buyer
- Network Rail Infrastructure London
Description
To provide fire risk assessments or reviews as directed at specified locations. The contractor(s) will provide where requested, fire engineering support, guidance and direction for both projects and actions, which may include Landlord Consents, Project Site Visits, Project Plan review, but not limited to those. Fire training for persons who are responsible for sites will be provided under the appropriate lot where required meeting legislation, site requirements and use of current systems to support those requiring the training. Contractors will also carry out, where required, assessments for Dangerous Substances and Explosive Atmospheres in accordance with current regulations and, where applicable, company policies or requirements. These should be carried out at the same time as any other assessments to reduce the number of times required to visit sites and mitigate duplication. Contractors may be required to either interface via API or manually to client systems to add actions from any assessments which are undertaken or provide data in a set format. All Assessments are to be based on the Risk Base platform for record keeping and provide access to all clients where required. 1. Conduct fire risk assessments or reviews at specified locations as directed. 2. Provide fire engineering support, guidance, and direction for projects and actions, including, but not limited to, Landlord Consents, Project Site Visits, and Project Plan review. 3. Offer fire training for site-responsible personnel as required under the appropriate lot to meet legislation, site requirements, and current system usage. 4. Perform assessments for Dangerous Substances and Explosive Atmospheres according to current regulations, company policies, or requirements, concurrently with other assessments to minimize site visits and reduce duplication. 5. Interface via API or manually with client systems to add actions from assessments undertaken or provide data in a set format. 6. Base all assessments on the Risk Base platform for record keeping and provide access to clients where needed.
Lot Division
| 1 | Fire Risk Assessments – Non-Critical Locations
Occupied (staffed) and unoccupied (unstaffed) locations such as, depots, offices, small stations |
| 2 | Fire Risk Assessments – Critical Locations
Key locations such as, larger stations and other premises as designated by respective companies |
| 3 | Fire Strategy
Railway stations and premises, while aligning with standards like BS 8644-1 and incorporating lessons from the Grenfell Inquiry to ensure safe design, operation, and emergency preparedness. This will also need to align for NR locations with NRs 6-step procedures |
| 4 | Fire Engineering Support
Fire engineering guidance for projects by a chartered fire engineer to assess and design bespoke fire strategies—especially for complex or non-standard buildings—ensuring compliance with legislation, enhancing safety outcomes, and enabling efficient, risk-informed solutions beyond prescriptive standards. |
| 5 | Fire Training
This lot involves training for fire risk assessors ahead of expected legislation changes. External companies currently cover this training |
| 6 | DESEAR
Where required outside a normal fire risk assessment, DSEAR (Dangerous Substances and Explosive Atmospheres Regulations) risk assessment is a structured process to identify, evaluate, and control risks from flammable substances or explosive atmospheres in the workplace, ensuring compliance with legal duties and implementing safe systems of work to protect people, property, and operation. |
| 7 | Tunnels
To undertake risk assessment on tunnels using the NR Technical Authority approved tool. Any bidders in this lot will need to have been approved by the TA on the use prior to bidding and have a chartered fire engineer in place to support. |
| 8 | GWR Fire Risk
Fire Risk Assessments (Non-Critical), Fire Risk Assessments (Critical), Fire Engineering Support & Fire Training (Great Western Railway) |
Renewal Options
1+1
Award Criteria
| Technical | Technical - 20 Lot specific technical- 20 Safety - 10 Social Value - 5 Innovation - 5 |
| Commercial | Commercial & Pricing Evaluation |
CPV Codes
- 75251110 - Fire-prevention services
Indicators
- Renewals are available.
Legal Justification
Not Applicable
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-05473a
- FTS 073942-2025