Description
This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. RAM Surfacing Framework B will include the following work activities: delivery of two or more concurrent resurfacing schemes on a public road; laying various types of asphalt surfacing by mechanical means and by hand, reshaping of carriageways, adjustment of street furniture to new levels, adjustment/provision of kerblines, adjustment/provision of carriageway drainage systems, Temporary Traffic Management, road marking/studs, other associated ancillary works. The Framework will comprise of four area Lots (Works Orders valued above £50k up to £750k) and a Project Lot (projects valued above £750k up to £5m) covering the following areas: - SFB E2 - Belfast South; - SFB N2 - Coleraine & Limavady; - SFB W3 - Dungannon; and - SFB S2 – Down. This Framework will deliver works from Call-Off contracts with an overall cumulative value of £150m (ex VAT) over the four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £181.5m (ex VAT).
Lot Division
| 1 | SFB P1 (Projects Lot)
Lot for NEC4 Call-Off Contracts awarded following a mini-competition process for Work Packages valued over £750k up to £5m covering all Framework contract areas. Award Criteria
| ||||||
| 2 | SFB E2 (Belfast South)
ICC Measured Term Contract for asphalt surfacing works within the Belfast South contract area (Works Orders valued above £50k up to £750k). The proposed contract relates to works with a cumulative value of £36m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £45m (ex VAT). Award Criteria
| ||||||
| 3 | SFB N2 (Coleraine and Limavady)
ICC Measured Term Contract for asphalt surfacing works within the Coleraine and Limavady contract area (Works Orders valued above £50k up to £750k). The proposed contract relates to works with a cumulative value of £34m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £42.5m (ex VAT). Award Criteria
| ||||||
| 4 | SFB W3 (Dungannon)
ICC Measured Term Contract for asphalt surfacing works within the Dungannon contract area (Works Orders valued above £50k up to £750k). The proposed contract relates to works with a cumulative value of £29.2m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £36.5m (ex VAT). Award Criteria
| ||||||
| 5 | SFB S2 (Down)
ICC Measured Term Contract for asphalt surfacing works within the Newry, Mourne & Down East (Down) contract area (Works Orders valued above £50k up to £750k). The proposed contract relates to works with a cumulative value of £29.2m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £33.5m (ex VAT). Award Criteria
|
CPV Codes
- 45200000 - Works for complete or part construction and civil engineering work
- 45233200 - Various surface works
Indicators
- This is a recurring contract.
- Options are available.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. ** The Department has extended the tender submission period by a further 9 nine days. All tenders must now be received by 15:00 on 18 December 2025.
Reference
- ocds-h6vhtk-05aa17
- FTS 074884-2025