Network Rail High Speed Buildings and Civils Minor Works Framework
A Utilities Contract Award Notice
by NETWORK RAIL HIGH SPEED LTD
- Source
- Find a Tender
- Type
- Framework (Works)
- Duration
- not specified
- Value
- 33M
- Sector
- CONSTRUCTION
- Published
- 16 Jan 2026
- Delivery
- not specified
- Deadline
- n/a
Related Terms
Location
London
2 buyers
- Network Rail High Speed London
2 suppliers
- B&M Mchugh London
- M Group Transport Rail & Aviation Stevenage
Description
Network Rail High Speed has put in place a number of frameworks to cover Buildings and Civils Minor Work Framework for CP4.
Lot Division
| 1 | Buildings Lot 1 - Buildings Works are to be performed in connection with the following categories of assets, incorporating inspection, maintenance, repair, partial or whole renewal of parts of: • Stations (assets contained within such as buildings, platforms, footbridges, train sheds, canopies) • Light maintenance depots • Maintenance delivery units • Critical lineside buildings (signal boxes, route operating centres, relay rooms) • Non-critical lineside buildings • Supply chain operations sites • Car parks, footpaths, and hardstanding • Walls (boundary, retaining and acoustic barriers) • Drainage including culverts |
| 2 | Civils Lot 2 - Civils Works are to be performed in connection with the following categories of assets, incorporating inspection, maintenance, repair, partial or whole renewal of parts of: • Bridges (underbridges, overbridges, footbridges, external stairs) • Viaducts • Tunnels • Walls (boundary, retaining and acoustic barriers) • Drainage including culverts • Structures • Earthworks (soil embankments, soil cuttings, rock cuttings and associated drainage works) • Roadways • Fencing (boundary and security) • Ancillary structures (e.g. foundations, support structures, access roads, fencing, gates, steps) |
Award Detail
| 1 | B&M Mchugh (London)
|
| 2 | M Group Transport Rail & Aviation (Stevenage)
|
Renewal Options
The initial term of the framework is to 31 March 2030 with options to extend for a further three (3) periods of one (1) year provided it is not beyond 31 March 2033.
Award Criteria
| Technical | 40.0 |
| PRICE | 60.0 |
CPV Codes
- 45234100 - Railway construction works
Indicators
- Options are available.
- Award on basis of price and quality.
Legal Justification
Selection of candidates was conducted using an authorised qualification mechanism RISQS (Railway Industry Supplier Qualification Scheme)
Other Information
Lot 1- Buildings: 1 Supplier Lot 2 - Civils: 1 Supplier CP4 covers the 5 year period from 1st April 2025 to 31st March 2030. The contract value is inclusive of estimated CPI increases over the contract duration and an allowance for change and risk contingency.
Reference
- FTS 003815-2026