MEP Engineering Services for Block 32 ASHP

A Contract Award Notice
by ISLE OF WIGHT

Source
Find a Tender
Type
Contract (Services)
Duration
not specified
Value
£36K
Sector
PROFESSIONAL
Published
27 Jan 2026
Delivery
not specified
Deadline
n/a

Related Terms

Location

Newport

Geochart for 2 buyers and 1 suppliers

2 buyers

1 supplier

Description

This is crucial, as the heating infrastructure has reached its end of life. The Trust requires a feasibility study that will only proceed to RIBA Stage 4.

Total Quantity or Scope

Production of a feasibility study, based on previous work undertaken for PSDS4 and design work for implementation of a change to air source heat pumps (ASHPs) from the existing gas fired boiler and water heaters within Block 32.

Award Detail

1 Hoare Lea (Bournemouth)
  • Num offers: 1
  • Value: £35,560

Award Criteria

PRICE _

CPV Codes

  • 71241000 - Feasibility study, advisory service, analysis

Indicators

  • Award on basis of price.

Reference

  • FTS 006970-2026

Domains