GMCA 1279 Temporary Fire Station Whitefield (Modular)
A Contract Award Notice
by GREATER MANCHESTER COMBINED AUTHORITY
- Source
- Contracts Finder
- Type
- Contract (Services)
- Duration
- 5.5 month
- Value
- £120K
- Sector
- CONSTRUCTION
- Published
- 19 Feb 2026
- Delivery
- 14 Oct 2024 to 27 Mar 2025
- Deadline
- 12 Oct 2024 15:00
Related Terms
Location
Geochart for 1 buyers and 1 suppliers
1 buyer
- Greater Manchester Combined Authority Manchester
1 supplier
- Premier Modular Brandesburton
Description
The scope includes the design, delivery, and installation of modular units manufactured to ISO9001 standards, offering a 60-minute structural fire resistance. The pre-construction phase includes the submission of all required drawings and specifications for approval. Installation on-site will involve delivery, offloading, siting, sealing, and bay-to-bay connections, using a 130-tonne crane for assembly. Direct award under NHS framework Modular Building Lot 2 - Bespoke Modular Buildings for Hire
Award Detail
| 1 | Premier Modular (Brandesburton)
|
CPV Codes
- 44211100 - Modular and portable buildings
Indicators
- Contract is suitable for SMEs.
Reference
- GMCA001-DN807576-02907567
- CF 4f449a8a-e912-4cb0-a162-451e55d5b6ab