Central Substation RIBA4 & Build

A Tender Notice
by KBS MARITIME LTD

Source
Contracts Finder
Type
Contract (Works)
Duration
1 day
Value
£1M
Sector
CONSTRUCTION
Published
25 Feb 2026
Delivery
28 Mar 2026 to 29 Mar 2026
Deadline
27 Mar 2026 15:00

Related Terms

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.

CPV Codes

  • 45000000 - Construction work
  • 45100000 - Site preparation work
  • 45200000 - Works for complete or part construction and civil engineering work
  • 45300000 - Building installation work

Indicators

  • Contract is suitable for SMEs.

Other Information

Additional data https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=103172&B=KBS User / Company https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/153032

Reference

  • 20260225110022-153032
  • CF 3001bab6-7d96-4385-bc96-45eda0d78114

Domains