SUPPLY CHAIN NOTICE - Central Substation RIBA4 & Build

A Pipeline Notice
by MINISTRY OF DEFENCE

Source
Contracts Finder
Type
Potential Contract ()
Duration
1 year
Value
£1M
Sector
CONSTRUCTION
Published
19 Mar 2026
Delivery
01 Jul 2026 to 01 Jul 2027
Deadline
01 Jan 1 00:00

Related Terms

Location

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: - WP 1: Survey and assessment work to facilitate the RIBA 4 design. - WP 2: RIBA 4 Technical Design incl. all temporary works designs. - WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: - WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1.

CPV Codes

  • 45232220 - Substation construction work

Indicators

  • Contract is suitable for SMEs.

Other Information

Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete. Those that meet the criteria of this initial phase will be invited to participate in a final competition. Deadlines for expressions of interest are the 27th March. Any expressions received after this date will not be accepted.