Civil Engineering Framework (Scotland)
A Modification Notice
by SCOTTISH GOVERNMENT
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 2 year
- Value
- £600M
- Sector
- CONSTRUCTION
- Published
- 24 Mar 2026
- Delivery
- To 23 Mar 2028 (est.)
- Deadline
- n/a
Related Terms
Location
Edinburgh
2 buyers
- Scottish Government Edinburgh
8 suppliers
- Amalgamated Construction Barnsley
- Farrans Construction Livningston
- Balfour Beatty Civil Engineering Eurocentral
- Galliford Try Construction Uxbridge
- Graham Riverside Building
- Morgan Sindall Construction & Infrastructure Motherwell
- Taziker Industrial Glasgow
- RJ Mcleod Contractors Glasgow
Description
Extension of the Civil Engineering Framework (Scotland) contract by 24 months, with the option to extend a further 24 months. The justification for the framework extension is on the basis of Regulation 72 (1) (c). There is no change to framework scope or value. A VEAT notification was published previously with a 28 day standstill period. The extension is required due to the current level of uncertainty around funding for public civil engineering projects in Scotland within the framework’s call-off value range of 5M-100M GBP. There is no certainty in terms of timelines for projects currently in the pipeline. As a result of this uncertainty, no call-offs have been undertaken and there is an inability to scope a successor arrangement to the current Civil Engineering Framework (Scotland). It is anticipated, that by extending the framework by 24 months, with the option to extend a further 24 months should uncertainty persist, this will allow for greater clarity around future pipeline and service needs. This should enable a future procurement to have an increased level of pipeline certainty and future demand. Due to the pausing or delay of projects 2024/2025, the anticipated spend through the framework Lots has been significantly below the stated contract value within the published Contract Notice – currently no call-off contracts have been undertaken. It is anticipated that value of the Framework Contract will not exceed the original value in the Contract Notice. The value referred to in this notice within sections V.2.4 and VII.1.6 refers to the initial value of the original framework procurement. There is no proposed modification to the overall nature of the framework.
Ammendments to Previous Notice
2. Contract value
GBP 600,000,000
Award Detail
| 1 | Amalgamated Construction (Barnsley)
|
| 2 | Farrans Construction (Livningston)
|
| 3 | Balfour Beatty Civil Engineering (Eurocentral)
|
| 4 | Galliford Try Construction (Uxbridge)
|
| 5 | Graham (Riverside Building)
|
| 6 | Morgan Sindall Construction & Infrastructure (Motherwell)
|
| 7 | Taziker Industrial (Glasgow)
|
| 8 | RJ Mcleod Contractors (Glasgow)
|
CPV Codes
- 45000000 - Construction work
Indicators
- Contract modified due to unforeseen circumstances.
Legal Justification
The extension is required due to the current level of uncertainty around funding for public civil engineering projects in Scotland within the framework’s call-off value range of 5M-100M GBP. There is no certainty in terms of timelines for projects currently in the pipeline. As a result of this uncertainty, no call-offs have been undertaken and there is an inability to scope a successor arrangement to the current Civil Engineering Framework (Scotland). It is anticipated, that by extending the framework by 24 months, with the option to extend a further 24 months should uncertainty persist, this will allow for greater clarity around future pipeline and service needs. This should enable a future procurement to have an increased level of pipeline certainty and future demand.
Other Information
(SC Ref:827171)
Reference
- FTS 027032-2026