Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package

A Modification Notice
by WREXHAM COUNTY BOROUGH COUNCIL

Source
Find a Tender
Type
Contract (Works)
Duration
31 month
Value
£4M-£5M
Sector
CONSTRUCTION
Published
26 Mar 2026
Delivery
20 May 2024 to 12 Dec 2026
Deadline
n/a

Related Terms

Location

Wrexham Museum, County Buildings, Regent St, Wrexham LL11 1RB

Geochart for 2 buyers and 1 suppliers

Description

Appointment of a principle building contractor for the Base Build Construction Works (Shell & Core) for the refurbishment of the Grade II Listed Wrexham County Borough Museum & Archives building (County Buildings, Regent Street, Wrexham) as part of the Museum of Two Halves (MoTH) project. The Museum of Two Halves will incorporate a new National Football Museum for Wales (Amgueddfa Bêl-droed Cymru) and refreshed Wrexham Museum (Amgueddfa Wrecsam).

Ammendments to Previous Notice

2. Contract value

GBP 4,174,397 5,196,074

Award Detail

1 SWG Construction Build & Renovate (Welshpool)
  • Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package
  • Reference: proc-23-26; cr-2905
  • Value: £4,174,397
  • Contractor is an SME.

CPV Codes

  • 45210000 - Building construction work

Indicators

  • Contract modified due to additional needs.

Other Information

This procurement process had two stages. First there was a Pre-Qualification Questionnaire Stage (PQQ) (pqq_33477), following which a shortlist of the 6 highest scoring bidders were progressed to Invitation to Tender Stage (ITT) (itt_107461). The procurement process was hosted on the eTenderWales (Bravo Solutions) online e-sourcing portal (https://etenderwales.bravosolution.co.uk/). This contract modification is to notify an increase in the contract price from GBP 4,174,397.04 to GBP 5,196,074.46 (all figures excluding VAT). This is to incorporate a number of unanticipated client scheme amends for additional works that could not have been foreseen and a resulting extended build programme. Many of these amends arose during the works due to the challenging nature of the old historic building. Changing contractor in the middle of the works was unviable due to economic (switching would cause significant inconvenience and duplication of costs) and technical reasons (requirements to meet grant funder timescales). The changes do not alter the overall nature of the contract. The End of Defects Liability Period has been extended to 9th March 2027. (WA Ref:163377)

Reference

  • FTS 027847-2026

Domains