S30075a Third Generation North Regional Traffic Model Build

A Contract Award Notice
by NATIONAL HIGHWAYS LIMITED

Source
Contracts Finder
Type
Contract (Services)
Duration
22.5 month
Value
£600K
Sector
PROFESSIONAL
Published
22 May 2026
Delivery
22 May 2026 to 31 Mar 2028
Deadline
25 Mar 2026 19:00

Related Terms

Location

Geochart for 1 buyers and 1 suppliers

1 buyer

1 supplier

Description

In brief, this project seeks to update the NRTM2 model to a new baseline of 2025 and provide a new set of forecasts. The baseline will reflect post-COVID travel conditions which will then be carried through into the forecasts. The refreshed models will then provide a better evidential basis to support their existing use cases, as well as new and emerging use cases. The models are required to be developed as far as is practicable in accordance with the guidance contained in TAG. The models should be calibrated and validated in line with the criteria developed for the second RTMs, with the intention to equal or improve on the second generation RTMs' calibration and validation performance. While delivering the service, the Consultant will: - Lead upon the Cal/Val Technical Consistency Group. The main activity under this Technical Consistency Group will be ensuring a consistent approach to Cal/Val is adopted by each RTM to achieve their model performance targets. - Input into the other Technical Consistency Groups led by other RTM3 model developers, providing critical challenge and following agreed upon methods. - Update the NRTM model networks in alignment with the advice set out by the Network TCG. - Update the NRTM forecasts in alignment with the advice set out by the Forecasting TCG. - Provide NRTM3 Handover Packages, including the final calibrated and validated models, as agreed in the End User TCG. While delivering the service, the Consultant must provide the following deliverables: - A Transport Data Package report detailing the data used in the build and calibration/validation of the model, and the relative robustness of these datasets. - A Model Development Report which details the methods utilised to update the models. The Model Development Report should be akin to a Transport Model Package report. - A Forecasting Report which details the methods utilised to update the forecasts. A Forecasting Report should be akin to a Transport Forecasting Package report. - The End-user Handover Packages, which contains any relevant data analysis / modelling files relevant for end-users of the model needed for the use cases identified above, as specified by the End User Technical Consistency Group. - A National Highways Handover Package which contains any relevant handover files used by the Consultant in the development of the model, which do not end up in the End User Handover Packages.

Award Detail

1 WSP (None)
  • Value: £450,588

CPV Codes

  • 73220000 - Development consultancy services

Indicators

  • Contract is suitable for SMEs.
  • Contract is suitable for VCOs.

Reference

  • tender_521056/1579194
  • CF a1aa5a8a-d919-42df-8ece-389861bd6cd6

Domains