Strategic Flood Risk Assessment and Water Cycle Study

A Contract Award Notice
by BOROUGH COUNCIL OF KINGS LYNN AND WEST NORFOLK

Source
Find a Tender
Type
Contract ()
Duration
not specified
Value
___
Sector
MISCELLANEOUS
Published
28 May 2026
Delivery
not specified
Deadline
n/a

Related Terms

Location

Geochart for 1 buyers and 1 suppliers

Description

The Borough Council of Kings Lynn and West Norfolk are required to undertake an Integrated SFRA and Water Cycle Study as an essential part of the pre-production/evidence gathering stages of the Local Plan and in preparation of the Sustainability Appraisal (SA). The Council is in the process of producing a New Local Plan (NLP) and this will require an update to the existing evidence base for the recently adopted Local Plan (March 2025). For this plan, the Council produced a joint Level 1 Strategic Flood Risk Assessment (SFRA) with other Norfolk Authorities. A separate Level 2 assessment was also produced to inform the allocation of sites. A current Water Cycle Study exists, but this is now considered out of date and should form part of the wider SFRA review. A Surface Water Management Plan was produced in 2012, but this is now considered out of date and will be replaced by this SFRA review.

Award Detail

1 Wallingford Hydrosolutions (Wallingford)
  • Reference: 1

CPV Codes

  • None found

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

  • ocds-h6vhtk-060651
  • FTS 050091-2026

Domains