Key Stage 2 classroom modular build
A Tender Notice
by TEAM MULTI-ACADEMY TRUST
- Source
- Find a Tender
- Type
- Contract (Works)
- Duration
- 1.5 month
- Value
- £187K
- Sector
- CONSTRUCTION
- Published
- 08 Jun 2026
- Delivery
- 23 Jul 2026 to 31 Aug 2026
- Deadline
- 29 Jun 2026 11:00
Related Terms
Location
Devon:
1 buyer
- Team Multi Academy Trust Barnstaple
Description
The build of a new standalone modular Key Stage 2 classroom (or double classroom) at Witheridge C of E Academy with a covered walkway to link back to the main building. - Minimum teaching space of 55m2 (per classroom if double) - 2 Toilets provided, one of which to be disabled - Cloakroom area included in design - Storeroom provision included in design - Covered walkway to link back to the main building - Building works including ground clearance and ground preparation - Survey and design including planning permission and building regulations - Project management costs including technical advice and full CMD. A site visit is available on Thursday 18th June - please contact us via the tender portal to arrange.
Renewal Options
The preferred completion date is to be ready for the start of the academic year in September but it is possible, under the right circumstances, to extend until the end of October half term break.
CPV Codes
- 45000000 - Construction work
Indicators
- Renewals are available.
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-06af53
- FTS 053611-2026