DfI TRAM Road Asset Management – Road Restraint Systems Framework

A Addendum Notice
by DFI TRANSPORT AND ROAD ASSET MANAGEMENT (TRAM)

Source
Find a Tender
Type
Framework (Works)
Duration
4 year
Value
£26M-£22M
Sector
CONSTRUCTION
Published
19 Jun 2026
Delivery
01 Nov 2026 to 31 Oct 2030
Deadline
06 Jul 2026 14:00

Related Terms

Location

Northern Ireland:

Geochart for 1 buyers and 0 suppliers

Description

This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023. RAM Road Restraint Systems Framework will include the following work activities: A. Road restraint systems installation and/or repair (standalone RRS including maintenance, renewals and new installations); B. Full or partial demolition of structures associated with road restraint systems; C. Earthworks D. Brickwork, blockwork and stonework E. Structural concrete construction and/or repairs associated with road restraint systems; F. Inspection assistance G. Temporary Traffic Management (TTM) on a live trafficked public road network H. Associated ancillary Works Further ancillary works may be asked of the successful Supplier such as: • Surface reinstatement • Site clearance including vegetation removal The Framework will comprise of three area Lots (Work Orders valued up to £750k exc VAT). A Project Lot will be used to deliver individual NEC ECC projects covering all the geographical areas detailed below (valued between £750,001 and £5m exc VAT Area Lots; • RRSF N1 – Causeway Coast & Glens, Mid & East Antrim and Antrim & Newtownabbey; • RRSF E&S1 – Belfast, Lisburn & Castlereagh, Armagh, Banbridge & Craigavon, Newry, Mourne & Down and Ards & North Down; • RRSF W1 – Mid Ulster, Derry & Strabane and Fermanagh & Omagh. This Framework will deliver works from Call-Off contracts with an overall cumulative value of £22m (ex VAT) over the four-year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the overall cumulative value to £27.5m (ex VAT).

Lot Division

1 RRSF P1 (Projects Lot)
  • Value: £4M

Lot for NEC4 Call-Off Contracts awarded following a mini-competition process for Work Packages valued over £750,001 up to £5m covering all Framework contract areas.

Award Criteria
Price Price
Quality Quality
2 RRSF N1 (Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim)
  • Value: £8M

ICC Measured Term Contract for structures works within the Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £6.2m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £7.75m (ex VAT).

Award Criteria
Price _
Quality _
Social Value _
3 RRSF E&S1 (Belfast; Lisburn and Castlereagh; Ards and North Down, Newry, Mourne and Down and Armagh, Banbridge and Craigavon)
  • Value: £8M

ICC Measured Term Contract for structures works within the Belfast; Lisburn and Castlereagh; Ards and North Down, Newry Mourne and Down and Armagh, Banbridge and Craigavon contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £6m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £7.5m (ex VAT).

Award Criteria
Price _
Quality _
Social Value _
4 RRSF W1 (Derry and Strabane; Fermanagh & Omagh; Mid-Ulster)
  • Value: £7M

Measured Term Contract for Structures works within the Derry and Strabane; Fermanagh & Omagh; Mid-Ulster contract area (Works Orders valued up to £750k). The proposed contract relates to works with a cumulative value of £5.8m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £7.25m (ex VAT).

Award Criteria
Price _
Quality _
Social Value _

Renewal Options

Framework Lot values may be shared with other Lots.

CPV Codes

  • 45000000 - Construction work
  • 45200000 - Works for complete or part construction and civil engineering work
  • 45220000 - Engineering works and construction works
  • 45221000 - Construction work for bridges and tunnels, shafts and subways
  • 45223000 - Structures construction work
  • 45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • 45233280 - Erection of road-barriers

Indicators

  • Restrictions apply to the lot award allocation.
  • This is a recurring contract.
  • Options are available.

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. ** The TSP Receipt Deadline has been amended to 3pm on Monday 6th July 2026.

Reference

  • ocds-h6vhtk-0696cd
  • FTS 058031-2026

Domains