Design and Construction of a Solar Farm and Battery Energy Storage System (BESS) at Docks Way Landfill Site

A Tender Notice
by CYSON CYMRU

Source
Find a Tender
Type
Contract (Works)
Duration
31 month
Value
£3M
Sector
CONSTRUCTION
Published
21 Jul 2026
Delivery
28 Aug 2026 to 02 Apr 2029
Deadline
17 Aug 2026 11:00

Related Terms

Location

Monmouthshire and Newport:

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

Cyson Cymru, on behalf of Newport City Council (NCC), is seeking Engineering, Procurement and Construction (EPC) proposals for the turnkey design, installation, and commissioning of the solar farm and a DC coupled battery with a 400V grid connection at the Newport City Council’s recycling centre depot in Newport, to form a fully compliant and working installation. It is anticipated that the EPC contract will be awarded in 2026, and the design and construction will be undertaken in 2026/7. The Contractor will be responsible for the supply, installation, and maintenance of a solar photovoltaic and battery system (the ‘Works’) up to 1.1MWp in gross PV capacity with a 2MWh DC battery energy storage system (BESS) on the land shown in Appendix 19.3 of the Specification, and located at grid reference ST306857. ITT Reference: ITT_126083 Please note that a pre market engagement notice was previously published in relation to this tender. MAR594663

Award Criteria

Quality Please refer to the Invitation to Tender document for further details on the Quality.
Price Please refer to the Invitation to Tender document for further details on pricing structure.

CPV Codes

  • 45000000 - Construction work
  • 09332000 - Solar installation
  • 09331000 - Solar panels
  • 31000000 - Electrical machinery, apparatus, equipment and consumables; lighting

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

  • ocds-h6vhtk-06cfc2
  • FTS 068661-2026