SGT Cooler Units

A Prior Information Notice
by UK ATOMIC ENERGY AUTHORITY

Source
Find a Tender
Type
Contract (Goods)
Duration
7 month
Value
£0-£233K
Sector
INDUSTRIAL
Published
20 May 2025
Delivery
06 Aug 2025 to 28 Feb 2026
Deadline
n/a

Related Terms

Location

Oxfordshire:

Geochart for 1 buyers and 0 suppliers

1 buyer

Description

The main HV Pulsed Power supply to the Culham site is via a dedicated overhead line fed directly from the National Grid at 400kV and transformed down by three 90 MVA 400/36kV super grid transformers (SGT’s) normally operated in parallel. Original installation of the Super-Grid Transformers was installed over 40 years ago and original spares are practically non-existent. They are an aging asset, with cooling becoming more critical with weather and with the potential of new increased loading due to new customers on site. Therefore, replacement of the 5 remaining Blast Air Coolers is important to extend the lifespan of the equipment. The Blast Air Coolers provide cooling to the oil inside the transformer tank. There are 4 Blast Air Coolers located on each SGT, for a total of 12 units. In 2016, the first phase of this replacement was carried out, replacing 7 of the original units. This project is to replace the remaining 5 original units.

CPV Codes

  • 42500000 - Cooling and ventilation equipment

Other Information

** PREVIEW NOTICE, please check Find a Tender for full details. **

Reference

  • ocds-h6vhtk-051955
  • FTS 023430-2025

Domains