SGT Cooler Units
A Prior Information Notice
by UK ATOMIC ENERGY AUTHORITY
- Source
- Find a Tender
- Type
- Contract (Goods)
- Duration
- 7 month
- Value
- £0-£233K
- Sector
- INDUSTRIAL
- Published
- 20 May 2025
- Delivery
- 06 Aug 2025 to 28 Feb 2026
- Deadline
- n/a
Related Terms
Location
Oxfordshire:
1 buyer
- UK Atomic Energy Authority Oxfordshire
Description
The main HV Pulsed Power supply to the Culham site is via a dedicated overhead line fed directly from the National Grid at 400kV and transformed down by three 90 MVA 400/36kV super grid transformers (SGT’s) normally operated in parallel. Original installation of the Super-Grid Transformers was installed over 40 years ago and original spares are practically non-existent. They are an aging asset, with cooling becoming more critical with weather and with the potential of new increased loading due to new customers on site. Therefore, replacement of the 5 remaining Blast Air Coolers is important to extend the lifespan of the equipment. The Blast Air Coolers provide cooling to the oil inside the transformer tank. There are 4 Blast Air Coolers located on each SGT, for a total of 12 units. In 2016, the first phase of this replacement was carried out, replacing 7 of the original units. This project is to replace the remaining 5 original units.
CPV Codes
- 42500000 - Cooling and ventilation equipment
Other Information
** PREVIEW NOTICE, please check Find a Tender for full details. **
Reference
- ocds-h6vhtk-051955
- FTS 023430-2025