REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)
A Tender Notice
by THE TALL SHIP GLENLEE TRUST
- Source
- Find a Tender
- Type
- Contract (Supply)
- Duration
- 1.5 month
- Value
- 70K
- Sector
- INDUSTRIAL
- Published
- 17 Dec 2025
- Delivery
- 30 Jan 2026 to 13 Mar 2026
- Deadline
- 16 Jan 2026 12:00
Related Terms
Location
The Tall Ship Glenlee, 150 Pointhouse Place, Glasgow, G3 8RS
2 buyers
- Tall Ship Glenlee Trust Glasgow
Description
The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund. Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.
Total Quantity or Scope
18. Insurance must be provided for a sum of GBP10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP10 million pounds in the aggregate and professional indemnity insurance in the aggregate.
Award Criteria
| Quality | 20.0 |
| Performance Criteria - Timely completion of project to meet funding requirements | 20.0 |
| PRICE | 20.0 |
CPV Codes
- 42416100 - Lifts
- 42416000 - Lifts, skip hoists, hoists, escalators and moving walkways
- 42416120 - Goods lifts
- 42416130 - Mechanical lifts
- 42419510 - Parts of lifts
- 42417000 - Elevators and conveyors
Indicators
- Bids should cover the whole contract.
- Renewals are not available.
- Award on basis of price.
Legal Justification
We are ok with 15 days
Other Information
NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=818861. (SC Ref:818861)
Reference
- FTS 083806-2025