REPLACEMENT DISABLED ACCESS LIFT FOR SV GLENLEE (THE TALL SHIP GLENLEE)

A Contract Addendum Notice
by THE TALL SHIP GLENLEE TRUST

Source
Find a Tender
Type
Contract (Supply)
Duration
1.5 month (est.)
Value
___
Sector
INDUSTRIAL
Published
15 Jan 2026
Delivery
30 Jan 2026 to 13 Mar 2026 (est.)
Deadline
n/a

Related Terms

Location

Glasgow

Geochart for 1 buyers and 0 suppliers

Description

The historic vessel, The Tall Ship Glenlee requires a replacement accessibility lift to be purchased and installed using funds from Museums Galleries Scotland Repair and Adaptation Fund. Contractor turnkey project requirement definition:- 1. Lift as presently configured with four access/ egress levels in weather deckhouse, ‘tween decks, mezzanine deck, hold, DDA compliant. 2. Platform lift capable of carrying a minimum load of 450kg and have a capacity alternatively for 5 persons. 3. Power – single phase 220 V AC. 4. Capable of operation in up to 2 degrees of ship list and 1 degree change of fore and aft trim of ship. 5. Does not need to meet fire evacuation requirements. 6. Design must accommodate the limited pit depth of <150mm. 7. Meet or exceed 2006/42CE. 8. All works must comply with CDM regs. 9. Lift must be capable of a minimum of 20 operational cycles per hour. 10. Normal duty cycle is 8 hours per day with some operational days of up to 24 hours per day. 11. A five-year warranty on all parts and labour/ hours is required. 12. A five-year maintenance package is required. 13. A key control is required to avoid unauthorised operations. 14. Turnkey project for removal of all components of old lift installation and installation and commissioning of new lift. 15. All responsibility for measurements, design, removal of old equipment and materials arisings from site. 16. All transportation of equipment and materials, lifting and craneage are part of the turnkey contract. 17. All works must comply with relevant Health and Safety at Work Act requirements. 18. Insurance must be provided for a sum of GBP 10 million pounds for any one occurrence. 19. Product liability insurance in the sum of GBP 10 million pounds in the aggregate and professional indemnity insurance in the aggregate. Client site works: - Works on essential support steel substructures for lift in lower hull steelwork blasting inspection, any necessary strengthening and protective coating whilst old lift removed must be completed before new lift installation.

Ammendments to Previous Notice

2. IV.2.2 Time limit

2026-01-16 2026-01-23 12:00

3. II.2.7 Duration Start

2026-01-30 2026-02-06

4. II.2.7 Duration End

2026-03-13 2026-03-20

5. IV.2.6 Minimum time frame during which the tenderer must maintain the tender

2026-02-16 2026-02-23

6. IV.2.7 Conditions for opening of tenders

2026-01-23 2026-01-30 12:00

CPV Codes

  • 42416100 - Lifts

Other Information

No notes of interest so far

Reference

  • FTS 003536-2026

Domains