Strategic Flood Risk Assessment and Water Cycle Study

A Addendum Notice
by BOROUGH COUNCIL OF KINGS LYNN AND WEST NORFOLK

Source
Find a Tender
Type
Contract (Services)
Duration
1 year
Value
___
Sector
ENVIRONMENT
Published
06 Feb 2026
Delivery
06 Apr 2026 to 05 Apr 2027
Deadline
19 Feb 2026 12:00

Related Terms

Location

Geochart for 1 buyers and 0 suppliers

Description

The Borough Council of Kings Lynn and West Norfolk are required to undertake an Integrated SFRA and Water Cycle Study as an essential part of the pre-production/evidence gathering stages of the Local Plan and in preparation of the Sustainability Appraisal (SA). The Council is in the process of producing a New Local Plan (NLP) and this will require an update to the existing evidence base for the recently adopted Local Plan (March 2025). For this plan, the Council produced a joint Level 1 Strategic Flood Risk Assessment (SFRA) with other Norfolk Authorities. A separate Level 2 assessment was also produced to inform the allocation of sites. A current Water Cycle Study exists, but this is now considered out of date and should form part of the wider SFRA review. A Surface Water Management Plan was produced in 2012, but this is now considered out of date and will be replaced by this SFRA review.

Renewal Options

Up to 1 year

Award Criteria

Total Fixed Price for completion of the Assessment And Hourly Rates
Methodology Methodology
Project Programme Project Programme

CPV Codes

  • 90700000 - Environmental services
  • 90711100 - Risk or hazard assessment other than for construction
  • 90712000 - Environmental planning

Indicators

  • Renewals are available.

Other Information

To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=1012417191 ** PREVIEW NOTICE, please check Find a Tender for full details. ** The Council have made the decision to extend the deadline for submissions to 19th February 2026 at 12:00 Noon.

Reference

  • ocds-h6vhtk-060651
  • FTS 010903-2026

Domains